Indian Railways plans to double the number of Shramik Trains to bring more relief to Migrants.
In addition to these Shramik Special trains, Indian Railways is going to start 200 new Time Tabled trains from June 1, 2020. The routes and schedule of these trains will be intimated soon.
The booking will ONLY online and shall commence in a few days.
Trains will be non AC. No tickets will be sold at any railway station and prospective travelers should not come to the railway station to buy tickets.
Indian Railways appeals to the migrants not to panic. Efforts are being made to ensure that all of them are able to travel to their home states at the earliest.
Efforts will be made such that they will be able to board trains from Railway Station Head on mainline which is close to their existing location.
Railways have asked the State Governments to identify and locate these migrants who are walking on roads to go to their home states and transport them to the nearest mainline railway station after doing their registration at the nearest district headquarters and give a list of these travelers to the Railway Authorities so that arrangements can be made for their further travel through Shramik specials.
More than 21.5 lac migrants have been transported to their home states through “Shramik Special” trains in 19 days and operated more than 1600 “Shramik Special” trains till 19th May.
Meanwhile ,first 12000 HP made in India Locomotive, manufactured by Madhepura Electric Loco Factory situated in Bihar, was put into operation by Indian Railways from Pt Deen Dayal Upadhyaya Jn Station yesterday for Covid 19 related freight management.
The loco is named WAG12 with Number 60027. The train departed from DeenDayalUpadhyaya Station at 14:08 hrs in long haul formation for the Dhanbad Division of East Central Railway, consisting of 118 wagons which traveled from Pt DeenDayalUpadhyayaJn to Barwadih via Dehri-on-Sone, Garhwa Road.
It was a proud moment for Indian Railways, as it became the 6th country in the world to join the elite club of producing high horsepower locomotive indigenously. It is the first time, high horsepower locomotive has been operationalized on a broad gauge track in the world. The locomotive has been produced under Make in India programme. The Madhepura factory is the largest integrated Green Field facility built to the highest standards of quality and safety with production capacity of 120 locomotives and spread across a massive 250 acres.
These locomotives are state of art IGBT based, 3 phase drive, 9000 KW (12000 horsepower) electric locomotive. The locomotive is capable of the maximum tractive effort of 706 kN, which is capable of starting and running a 6000 T train in the gradient of 1 in 150. The locomotive with twin Bo-Bo design having 22.5 T (Tonnes) axle load is upgradable to 25 Tonnes with design speed of 120 kmph. This locomotive will be a game-changer for further movement of coal trains for Dedicated Freight Corridor. The locomotives can be tracked through GPS for its strategic use through embedded software and Antennae being lifted through the servers on the ground through a microwave link.
The locomotive is capable of working on railway tracks with conventional OHE lines as well as on Dedicated Freight corridors with high rise OHE lines. The locomotive has air-conditioned driver cabs on either side. The locomotive is equipped with a regenerative braking system that provides substantial energy savings during operations. These high horsepower locomotives will help to decongest the saturated tracks by improving the average speed of freight trains.
Madhepura Electric Locomotive Pvt. Ltd. (MELPL) will manufacture 800 State of the Art 12000 HP Electric Freight Locomotives in 11 years and being one of the most power full-electric locomotives in the world will increase the speed of freight trains and will allow faster, safer and heavier freight trains to move across the country, thus reducing congestion in traffic. It will also lead to considerable savings in energy consumption through regenerative braking. As part of the project, the factory along with township has been set up in Madhepura, Bihar with the capacity to manufacture 120 locomotives per year. The project will create more than 10,000 direct and indirect jobs in the country. More than Rs 2000 Crores has already been invested in the project by the company.
Along with the factory, socio-economic development in Madhepura is being driven by this project. As part of CSR initiative skill centers are being set up in Madhepura to impart training to local people.
It may be noted that Indian Railways entered into Procurement cum Maintenance Agreement with Madhepura Electric Locomotive Pvt. Ltd. (MELPL), as part of the largest Foreign Direct Investment project of Indian Railways to transform the heavy freight transportation landscape of the country. This is ‘Make in India’ Initiative by India Railways (IR).
The project started in 2018 and the Prime Minister of India inaugurated the project on 10th April 2018. The prototype locomotive was delivered in March 2018. Based on the test results having design issues, the complete locomotive including bogies has been redesigned. The new design of locomotive has been inspected by RDSO at the Madhepura factory and cleared for dispatch from the factory on 16th Nov’ 2019. Further RDSO has conducted oscillation trials at various speeds up to 132 kmph and the locomotive has passed oscillation trials successfully. The locomotive has made its maiden commercial run between DeenDayalUpadhaya Station to Shivpur on 18.05.2020. The design was completed for the whole locomotive in a record time of four to six months and despite the initial hiccups and the onset of the COVID-19 pandemic, it could not dampen the spirit of August initiative of IR, surpassing all odds we could secure the permission of the Bihar Govt. to resume operations at the Madhepura Factory putting the project back on track.